/ 2042 Puurakenteinen jalkapallohalli

Project: Football hall
Client: Skanska Etelä-Suomi
Design Team: POOK Arkkitehtitoimisto Ltd
Structural engineering: Nuvo Engineering Oy

untitled-23

Picture 1 of 4

A tree like structure based on a repeated sickle-arc system was used to achieve the required span and free heights of the football hall. Particular attention was paid to the continuity of the elements and a simple mount technology was used.